Stone World Wiki

Rebuilding Civilization from Scratch

Ancient Egyptian Technology

Prerequisites

Description

Ancient Egyptian technology represents a significant advancement in human engineering and construction capabilities. The Egyptians developed sophisticated methods for working with stone, wood, and other materials, creating structures and tools that have endured for millennia. This guide covers practical implementations of Egyptian technological principles that can be achieved using only tools and knowledge available from prehistoric technology.

Ancient Egyptian shaduf water lifting device

The shaduf water lifting device was a revolutionary Egyptian technology for irrigation

Practical Guide to Ancient Egyptian Technology

1. Advanced Stone Working

Stone Quarrying Techniques

  1. Identify natural fracture lines in stone deposits
  2. Create a line of holes along the desired cutting line using stone or copper chisels
  3. Insert wooden wedges into the holes
  4. Soak the wedges with water to cause expansion and split the stone
  5. Alternatively, build fires on the stone surface and then rapidly cool with water to create fractures

Stone Dressing and Finishing

  1. Rough shaping using stone hammers and chisels
  2. Progressive refinement using increasingly finer abrasive stones
  3. Final polishing with wet sand on leather pads
  4. Create flat surfaces by rubbing stones against a reference flat surface with abrasive sand

Stone Cutting Tools

  1. Create dolerite pounding stones for initial rough work
  2. Manufacture copper chisels by cold-hammering copper nuggets
  3. Develop stone saws using copper blades with abrasive sand
  4. Build bow drills with copper or hard stone bits for precise hole drilling

2. Construction and Engineering

Foundation Techniques

  1. Level ground using water-filled trenches as reference points
  2. Create corner markers using the 3-4-5 triangle method for square corners:
    • Mark a straight line for one side
    • Measure 3 units along this line from the corner
    • Measure 4 units perpendicular to the first line
    • The hypotenuse should measure exactly 5 units if the corner is square
  3. Prepare stable foundations using compacted sand or rubble
  4. Create foundation trenches filled with stone to prevent settling

Block Transportation

  1. Construct wooden sledges for moving heavy stones
  2. Create pathways of dampened clay or mud to reduce friction
  3. Use lever systems with fulcrums to raise blocks incrementally
  4. Develop rocking techniques to move blocks forward in controlled increments
  5. Build ramps of earth and rubble for vertical transportation

Block Placement and Alignment

  1. Use plumb bobs (weighted strings) to ensure vertical alignment
  2. Create water levels for horizontal alignment:
    • Connect two containers with a water-filled tube
    • Water will reach the same level in both containers
  3. Develop sliding cradles to position blocks precisely
  4. Create wooden or stone shims for fine adjustments

3. Advanced Woodworking

Joinery Techniques

  1. Develop mortise and tenon joints:
    • Create a rectangular hole (mortise) in one piece
    • Shape a corresponding projection (tenon) on the joining piece
    • Secure with wooden pegs through both pieces
  2. Create dovetail joints for corner connections:
    • Cut fan-shaped projections on one piece
    • Cut matching recesses in the joining piece
  3. Develop miter joints for frame corners
  4. Create lap joints for overlapping connections

Wood Preparation

  1. Season wood by controlled drying to prevent warping
  2. Create straight reference edges for accurate cutting
  3. Develop smoothing techniques using progressively finer abrasives
  4. Apply oils and waxes for preservation and finishing

Advanced Woodworking Tools

  1. Create pull saws with copper or flint teeth
  2. Develop specialized adzes for shaping and smoothing
  3. Build bow drills for precise hole making
  4. Manufacture wooden mallets for controlled force application

4. Measurement and Design

Standard Measurement Systems

  1. Create a cubit rod (approximately the length from elbow to fingertip)
  2. Divide the cubit into smaller units (palms and fingers)
  3. Develop measurement cords with regular knots
  4. Create angle measurement tools using plumb bobs and protractors

Scale Models and Planning

  1. Develop techniques for creating scale drawings on papyrus or clay
  2. Build small-scale models of structures before full construction
  3. Create grid systems for transferring designs to full scale
  4. Develop standard proportional systems for aesthetic consistency

5. Water Management

Irrigation Systems

  1. Construct water channels with controlled gradients
  2. Develop the shaduf (counterbalanced lever) for lifting water:
    • Mount a long beam on a pivot point
    • Attach a counterweight to one end
    • Hang a bucket from the other end
    • Use the counterweight to assist in lifting water
  3. Create water distribution systems with sluice gates
  4. Build terraced fields for efficient water use

Water Storage

  1. Construct cisterns lined with clay or lime plaster
  2. Build settling basins to remove sediment
  3. Create underground storage chambers to reduce evaporation
  4. Develop water lifting devices for multi-level distribution

Troubleshooting Common Issues

Stone Breakage During Working

Cause: Striking too hard or against the grain
Solution: Work with the natural structure of the stone; use progressive, controlled force

Structural Instability

Cause: Inadequate foundations or improper block placement
Solution: Ensure level foundations; use interlocking patterns; maintain proper vertical alignment

Wood Joint Failure

Cause: Poor fit, wood movement, or inadequate reinforcement
Solution: Create tighter fits; account for wood expansion; use pegs or lashings for reinforcement

Water System Leakage

Cause: Poor sealing or structural movement
Solution: Use clay or lime sealants; build flexible joints; regular maintenance